HighLights – Airport Berlin
During the apron expansion A project at Berlin Airport, we installed 7 brand-new steel masts with a HighLight lowering system. The entire apron was rebuilt, and therefore, this area was not a part of the airside during the construction. They delivered the HighLight system and completed the whole project on schedule.
52.364044, 13.508999
Location
Berlin Airport, Germany
Comissioning
2022
Number of Masts
7 pieces
Mast Height
30 m
Utility load
750 kg