As part of Apron Extension A, 7 completely new solid steel masts with the HighLight lowering system were installed at Berlin Airport. The entire apron was newly constructed and therefore this area was not part of the airside during the construction phase. The HighLights product and the overall project were handed over to the client on schedule.

back

Location

Berlin Airport, Germany

Commissioning

2022

Number of masts

7

 

Mast height

30 m

 

Payload

750 kg