HighLights – Berlin Airport
As part of Apron Extension A, 7 completely new solid steel masts with the HighLight lowering system were installed at Berlin Airport. The entire apron was newly constructed and therefore this area was not part of the airside during the construction phase. The HighLights product and the overall project were handed over to the client on schedule.
Location
Berlin Airport, Germany
Commissioning
2022
Number of masts
7
Mast height
30 m
Payload
750 kg